Permission summary
- Permission ID
- DL000300054
- Issue date
- Expiry date
- Status
- Active
- Activity site
-
2a Francis Street, Yarraville, Victoria, 3013, Australia
Permission holder
- Name
- Address
- Name
- STEEL CEMENT PTY LTD
- Address
- 750 LORIMER ST
PORT MELBOURNE VIC 3207
AU
Activity
View a list of all activities EPA regulates.- Transaction
- Status
- Transaction
- H01 (Cement)
- Status
- Issued
More permission details
-
Conditions
Learn more about permission conditions.
- Code
- Description
- Code
- DL_C01
- Description
- Commissioning activities must be undertaken in accordance with the commissioning plan approved by the Authority.
- Code
- DL_C02
- Description
- You must immediately notify the Authority by calling 1300 EPA VIC (1300 372 842) in the event of: a) A discharge, emission or deposit which gives rise to, or may give rise to, actual or potential harm to human health or the environment; b) A malfunction, breakdown or failure of risk control measures at the site which could reasonably be expected to give rise to actual or potential harm to human health or the environment; or c) Any breach of the licence.
- Code
- DL_C03
- Description
- Construction and commissioning must not cause or result in any breach of any permission issued by the Authority for the permission activity, except where authorised by a condition of this licence.
- Code
- DL_C05
- Description
- 1. You must develop a risk management and monitoring program for your activities which: (a) identifies all the risks of harm to human health and the environment which may arise from the activities you are engaging in at your activity site; (b) clearly defines your environmental performance objectives; (c) clearly defines your risk control performance objectives; (d) describes how the environmental and risk control performance objectives are being achieved; (e) identifies and describes how you will continue to eliminate or minimise the risks in 1(a) (above) so far as reasonably practicable; and (f) describes how the information collated in compliance with this clause, is or will be disseminated, used or otherwise considered by you or any other entity. 2. The risk management and monitoring program must be: (a) documented in writing; (b) signed by a duly authorised officer of the licensed entity (c) made available to the Authority on request.
- Code
- DL_C06
- Description
- Within 60 days of the expiry of this permission, you must provide to EPA a report detailing the results of the commissioning monitoring program.
- Code
- DL_C07
- Description
- Within 45 days of the completion of the approved activities, you must provide to EPA a written report that summarises the activities undertaken and includes: a commissioning report that summarises the results of all commissioning and proof of performance activities. This report should confirm that the performance objectives as outlined under DL_R01, DL_R04 and DL_W01 have been met.
- Code
- DL_C12
- Description
- Waste from the activity site must not be discharged or disposed of to the environment except in accordance with this permission and with any other permission issued by the Authority that may relate to the activity site.
- Code
- DL_G01
- Description
- A copy of this licence must be kept at the site and be easily accessible to persons who are engaging in an activity conducted at the site. Information regarding the requirements of the licence and the Act duties must be included in site induction and training information.
- Code
- DL_G02
- Description
- The development of the facility for Activity Type H01 (Cement works) must be constructed in accordance with the listed approved plans and documents: a) Air Quality Assessment_Ektimo_R012813-1_29 Jun 2022, b) Noise Assessment Report_SLR_640.30487-R01_15 Sep 2022, c) Heritage Impact Statement Final Report_GML_31 August 2022, d) Preliminary Design Drawings_MLEI, e) Stormwater Management For Building and Works_KPA Management_23 Aug 2022, f) Traffice Engineering Assessment_Traffix Group_2023, g) Aboriginal Cultural Heritage Final Report_GML_31 August 2022, h) Grinding Mill Study Operational Requirements DRAFT_ICL_8 Sep 2022, i) HMB ICL Combined, j) EPA EAN-00003503 - STEEL CEMENT PTY LTD_19 Oct 2022, k) Air Quality Assessment_Ektimo_5 Sep 2022, l) SCL EPA License_128502, m) SCL Operational EMP, n) Process Flow Diagrams, o) Drainage Plans, p) Servicing Report_Verve_8 November 2022, q) Hot gas generator, r) InterceptorPitLocations, s) New Mill Operating Costs_, t) Example Community Meeting Minutes, u) NOA, v) OL000128502 - Statutory Document, w) APP018889 - Application Details x) Credit-Report-SCL_14 Mar 2023, y) F1017-Fit and Proper Person Questionnaire_19 Apr 2023, z) F1018_Prohibited Person Questionnaire, aa) APP018889 – Invoice, bb) 2022-066 New Grinding Plant_Dev App, cc) M023-1969_C_2023.11.03, dd) M023-1969_Stormwater Management Report_A, ee) M023-1969_RevA, ff) M023-1969_MUSIC, gg) ESG2022-061 Response to EPA RFI and Objections for Development of Clinker Plant V1, hh) ESG2022-061 Response to EPA RFI - Stormwater V1. In the event of any inconsistency between the approved documents and the conditions of this permission, the conditions of this permission shall prevail.
- Code
- DL_G03
- Description
- Subject to the following conditions, this development licence allows you to: construct the following works Stage 1 • Milling o 100tph Slag/Clinker Grinding Capacity o Mill Feed bins o Slag Feed bins • Wharf o Hopper and conveyor system at Berth #6 • Raw Material Storage o 90,000T Clinker Storage and Automated Reclaim o 12,000T Limestone Storage o 12,000T Gypsum storage • Despatch o 18,000T Despatch Storage Capacity o 4 Weighbridges o Integration with the existing G-Tick weighbridge system Stage 2 • Milling o 100tph Slag/Clinker Grinding Capacity • Despatch o 9000T Despatch Storage Capacity o 2 Weighbridges.
- Code
- DL_G04
- Description
- This permission does not take effect until a copy of any planning permit or amendment to a planning scheme required under the Planning and Environment Act 1987 (Vic) and related planning schemes has been provided to the Authority by the applicant.
- Code
- DL_G05
- Description
- This permission expires: (a) on the issue or amendment of an operating licence or permit relating to all activities covered by this permission; (b) when the Authority advises in writing that all activities covered by this permission have been satisfactorily completed and the issue or amendment of an operating licence or permit is not required; or c) on the expiry date listed on the front page of this permission.
- Code
- DL_R01
- Description
- At least 40 business days before the commencement of any commissioning, you must provide to the Authority report/reports for approval that include(s): (1) a Commissioning Plan that includes (but not limited to): (a) a noise measurement program including an assessment of noise character, to ensure the acoustic objectives of the project are satisfied at the onset of operation, and the mitigation measures for low frequency noise are effective. (b) an air monitoring/verification program to confirm performance of the air control system including the mill and air filters. The commissioning must ensure air emission objectives of the project are satisfied at the onset of operation (2) the Risk Management and Monitoring program (RMMP) referred to condition DL_C5 that includes (but not limited to): (a) an operational noise and vibration management plan, that include(s) (i) the ‘management controls’ specified in the section 7 of the Rev.1 of the Noise Assessment Report (ii) ongoing inspection, maintenance and testing programs to prevent the emission of unreasonable noise; and (b) an air management plan, which includes air monitoring at the major discharge points as well as a program to continually improve dust mitigation. (c) stormwater monitoring plan including (i) quarterly monitoring within 24 hours of rainfall events, with paired inflow and outflow samples. (ii) testing for water captured in bunded areas prior to discharge.
- Code
- DL_R02
- Description
- You must not commence commissioning of the operating components of the development activities until you have received the Authority's written approval of the report(s)/plan(s) which is required pursuant to condition(s) DL_R01.
- Code
- DL_R04
- Description
- At least 40 business days before the commencement of any construction, you must provide to the Authority report/report(s) that include(s): for approval (1) final detailed designs and schematics of the final layout of the facility specified in condition DL_G03 including: a) designs and locations of the noise control measures b) designs and locations of the air control equipment (2) an auditor construction environmental management plan (CEMP) that includes: (a) description of the proposed construction activities and with reference to appropriate guidance, such as - Civil construction, building and demolition guidance (EPA Publication 1834). (b) measures during construction for the management of contaminated soils and to prevent impact to stormwater from contaminated soils. (3) An updated noise assessment report based on the detail design specifications supported by verifiable evidence, that include(s), (a) sound power levels for the selected plant and equipment to be installed, including 1/3 octave band levels in the low frequency range. (b) an assessment conducted in accordance with the Noise limit and assessment protocol for the control of noise from commercial, industrial and trade premises and entertainment venues (Noise Protocol, publication 1826) and consistent with the provisions of the Technical guide: Measuring and analysing industry noise and music noise (publication 1997), that must, (i) demonstrate that the contribution of the project to the effective noise levels at noise sensitive areas will not exceed the noise limits calculated in accordance with Part I of the Noise Protocol minus three decibels (3 dB) (ii) consider measurement/calculation uncertainty, and (iii) demonstrate consideration of Best Available Techniques and Technology (BATT) (c) the noise mitigation measures to be implemented at source, including those specified in specified in section 7 of the Rev.1 of the Noise Assessment Report (document gg). (d) controls to mitigate low frequency noise that will be implemented.
- Code
- DL_W01
- Description
- At least 4 months prior to commencing construction of the following components of the development activity, you must provide to the Authority for approval: Report/reports regarding the Stage 2 development works consisting of - 100tph Slag/Clinker Grinding Capacity - 9000T Despatch Storage Capacity - 2 Weighbridges. The following information should be included: (1) final detailed designs and schematics of the final layout of the facility specified in condition DL_G03 including: a) designs and locations of the noise control measures b) designs and locations of the air control equipment (2) An updated noise assessment report based on the detail design specifications supported by verifiable evidence, that includes, (a) sound power levels for the selected plant and equipment to be installed, including 1/3 octave band levels in the low frequency range. (b) an assessment conducted in accordance with the Noise limit and assessment protocol for the control of noise from commercial, industrial and trade premises and entertainment venues (Noise Protocol, publication 1826) and consistent with the provisions of the Technical guide: Measuring and analysing industry noise and music noise (publication 1997) as amended from time to time, that must, (i) demonstrate that the contribution of the project to the effective noise levels at noise sensitive areas will not exceed the noise limits calculated in accordance with Part I of the Noise Protocol minus three decibels (3 dB) (ii) consider measurement/calculation uncertainty, and (iii) demonstrate consideration of Best Available Techniques and Technology (BATT) (c) the noise mitigation measures to be implemented at source (d) controls to mitigate low frequency noise that will be implemented. (3) An updated air assessment report that includes, (a) revised air modelling in accordance with the Guideline for assessing and minimising air pollution (publication 1961) as amended from time to time, (i) demonstrating that emissions from the proposal for PM2.5, PM10, NOx and SOx will not exceed impacts indicated in the application documents DL_G02. (b) providing air mitigation measures in line with Best Available Techniques and Technology (4) ) a construction environmental management plan (CEMP) that includes: (a) description of the proposed construction activities and with reference to appropriate guidance, such as - Civil construction, building and demolition guidance (EPA Publication 1834).
- Code
- DL_W02
- Description
- You must notify the Authority in writing when the development activity authorised by this permission has commenced.
- Code
- DL_W03
- Description
- You must notify the Authority when the construction associated with the development activities covered by this approval has been completed.
- Code
- DL_W09.01
- Description
- You must install all exhaust stacks so that provisions for sampling are included in accordance with “A Guide to the Sampling and Analysis of Air Emissions and Air Quality” (EPA Publication 440.1, released December 2002), or as approved by the Authority.
- Code
- DL_W13
- Description
- During construction, you must ensure that all activities are carried out in accordance with the approved Construction Environmental management Plan (CEMP) referred to in condition DL_R04 and DL_W01.
-
Waste information
Learn more about waste acceptance regulations.
No current or historical records
-
Documents
In the event of a discrepancy between the conditions listed on this page and the linked statutory document, the statutory document prevails
-
Performance Statements
There are no performance statements