Permission summary

Permission ID
EXM000300096
Issue date
Expiry date
Status
Expired
Activity site

8533 Murray Valley Highway Boundary Bend 3599

Permission holder

BOUNDARY BEND OLIVES PTY LTD
151 Broderick Road
Lara VIC 3212
Australia

Activity

View a list of all activities EPA regulates.
A08 (Waste to energy)
Expired

More permission details

  • Conditions

    Learn more about permission conditions.

    EX_01
    You must immediately notify the Authority by calling 1300 EPA VIC (1300 372 842) in the event of: a) A discharge, emission or deposit which gives rise to, or may give rise to, actual or potential harm to human health or the environment; b) A malfunction, breakdown or failure of risk control measures at the site which could reasonably be expected to give rise to actual or potential harm to human health or the environment; or c) Any breach of this exemption.
    EX_02
    You must notify the Authority within 48 hours of the occurrence of any the following: (a) Any change to your name or address (including your registered address and site as applicable); or (b) A change to an officer (as defined in the Act). You must update the EPA Portal if any other relevant administrative details for your business change.
    EX_03
    This exemption expires (a) on the issue or amendment of an operating licence or permit relating to all activities covered by this permission; (b) when the Authority advises in writing that all activities covered by this permission have been satisfactorily completed and the issue or amendment of an operating licence or permit is not required; or (c) on the expiry date listed on the front page of this permission.
    EX_04
    A copy of this exemption must be kept at the activity site and be easily accessible to persons who are engaging in an activity conducted at the activity site. Information regarding the requirements of the exemption and the Act duties must be included in site induction and training information.
    EX_05
    1. You must develop a risk management and monitoring program for your activities which: (a) identifies all the risks of harm to human health and the environment which may arise from the activities you are engaging in at your activity site; (b) clearly defines your environmental performance objectives; (c) clearly defines your risk control performance objectives; (d) describes how the environmental and risk control performance objectives are being achieved; (e) identifies and describes how you will continue to eliminate or minimise the risks in 1(a) (above) so far as reasonably practicable; and (f) describes how the information collated in compliance with this clause, is or will be disseminated, used or otherwise considered by you or any other entity. 2. The risk management and monitoring program must be: (a) documented in writing; (b) signed by a duly authorised officer of the licensed entity (c) made available to the Authority on request.
    EX_06
    Subject to the following conditions, this exemption allows you to: In accordance with application (APP024428), install and commission a 5.8MW olive pomace tumble dryer which recovers heat generated from the combustion of olive pomace waste designed to a minimum R1 energy efficiency of 0.76 (calculated in accordance with EPA guideline 1559).
    EX_07
    Waste from the activity site must not be discharged or disposed of to the environment except in accordance with this exemption or with any permission or approval issued by the Authority that may relate to the activity site.
    EX_08
    You must undertake the following actions: 20 business days prior to the completion of all commissioning activities 1) prepare the following plans and reports: a) an operational management plan for the management and handling of wet pomace, ash/slag and dry pomace b) provide the Authority a commissioning report detailing as a minimum i) performance data demonstrating the system is capable of recovering energy to a minimum R1 energy efficiency of 0.76 ii) programme for the implementation of contingency measures where ever necessary to maintain the minimum R1 energy efficient of 0.76 iii) ensure acoustic objectives of the project are satisfied at the onset of operation iv) ensure air emission objectives or the project are satisfied at the onset or operation 2) have the Authority inspect the completed development 3) prior to the operation of the activity obtain written approval from the Authority that the development has been completed in accordance with the application and this approval.
    EX_D04
    You must notify the Authority when the developments covered by this exemption has been completed.
    EX_R01
    At least 20 business days before the commencement of any commissioning, you must provide to the Authority for approval a commissioning programme that include(s): 1) a verification monitoring programme to determine plant performance in accordance with the application and specifically the designed minimum R1 energy efficiency of 0.76 2) during operation of the system verification monitoring programme to determine noise emissions in accordance with EPA publication 1996 and 1997, with the adoption of mitigation measures as necessary 3) during operation of the system verification monitoring programme to determine air emissions 4) analytical programme for outputs from the activity including ash/slag, wastewater and dry pomace.
  • Waste information

    Learn more about waste acceptance regulations.

    No current or historical records

  • Documents

    In the event of a discrepancy between the conditions listed on this page and the linked statutory document, the statutory document prevails

  • Performance Statements

    There are no performance statements